Development of Imam Khomeini International Airport is proposed to double the capacity of passengers’ transportation with an EPC contract. In addition, the costume service, administration and cargo area has been increased by 70 % of its initial situation.
Technical Specification
The development works with thearea of 22,000 square meters including: Adding two pier structures at the right and left side of the existing plan.
Development of administration and costume building at the right and left side of the existing plan.
Adding recreational and food court area to the down side of the existing plan. Disassembly and Re-assembly of the complex existing facade due